Page 19 - Proceeding 2015
P. 19

ALPOPI Cristina                             FAMP

                              DEVELOPMENT OF HEAT PUBLIC SERVICE SUPPLY - STRATEGIC OBJECTIVE OF LOCAL      CCASP
                                                         GOVERNMENT









                   PROCEEDINGS OF THE 11 TH  ADMINISTRATION AND PUBLIC MANAGEMENT INTERNATIONAL CONFERENCE
















                                               FIGURE 3 – THE EVOLUTION OF GCAL TARIFF PAID BY THE POPULATION
                                                                Source: Vasile, 2014

                              The economical solution of a cogeneration plant is that to be managed by local authorities, based on local
                        30 th  – 31 st  October 2015  ”Strategic Management for Local Communities”   Bucharest   can keep heat consumers and also to be able to regain the disconnected consumers (Bacau City Hall,
                              energy planning. This implies that the cogeneration plants was able to establish their selling prices so that


                              2014).


                              The causes of inefficiency and abolition of centralized heating systems were:

                                 ?  Thermal power plants and those of block, due to the closure of industrial sites and the reduction
                                     of urban consumption, have become oversize in relation to consumption;

                                 ?  Technical performance of systems  decreased in time due to technical wear, remaining at the

                                     technological level of the 60s and 70s;

                                 ?  Thermal plants transfer from RENEL to local authorities, transfer which is carried out between
                                     1997-2004,  showed  inefficient  systems,  considering  that  the  economics  analysis  has  not

                                     achieved more globally, but individually;

                                 ?  After the 2006 pricing policy did not allow more full coverage of heat energy costs through grants.
                                     By  destroying  the  national  reference  price,  there  were  adopted  local  reference  prices,

                                     unbearable for some localities.

                              For insufficiency of funds for refurbishment, replacement and repair are responsible the following causes:

                                 ?  Cashings from the population were below the billed;

                                 ?  Subsidies were insufficient;